Concept art for new Saratoga pool
Concept Art for New Saratoga pool
During the presentation at the 2009 Condo Association meeting, Jim Lewis provided the following information regarding Saratoga the pool project:
Construction is expected to begin in the fall of 2010 and run through spring 2011.
Below is a high-quality rendering of the concept artwork for the new pool facility.
- The pool will be 3,300 sq ft--roughly triple the size of the current quiet pool on this site (about 3/4 the size of the High Rock Spring feature pool)
- It will include a 146-ft water slide
- There will be a 1,200 sq ft water play area for children
- Lifeguards will be on duty
- A Quick Service dining location will also be added (burgers & fries)
- Construction cost is approximately $.41 per point to be paid from reserve fund
Construction is expected to begin in the fall of 2010 and run through spring 2011.
Below is a high-quality rendering of the concept artwork for the new pool facility.

What do you think? Leave your comments below
If you have some Disney news call the Disney By The Numbers
hotline at +1 407 - 374- DBTN (3286)
blog comments powered by Disqus

